Providing consultation on construction material selection and usage
Free assistance from our staff for usage support
Track Your Package
Spray a thin layer of the white developer (FD-S) evenly onto the surface to be tested. Recommended dwell time is 7–30 minutes, depending on the condition of the test piece.
Copyright 2025 Deksangbaan Trading All rights reserved.
กรุณากรอกข้อมูลเพื่อขอใบเสนอราคาในการสั่งซื้อ